ARC Infrastructure Eastern Goldfields Railway Rock Buttressing Stabilisation Works Phase 2

//

Project: Eastern Goldfields Railway Rock Buttressing Stabilisation Works Phase 2
Client: ARC Infrastructure
Project Duration: In progress
Consulting Engineer: Advisian WorleyParsons Group

Description

Italia Stone Group was awarded the contract for supply and installation of 75mm granite rock fill and supply and installation of Sub-ballast capping. Italia produced 6000 tonnes of 75mm granite rock fill in their Northam quarry for the project. Italia imported 2000 Tonnes of Sub-ballast capping for the construction of the top layers of the rail stabilisation.

The main scope of works included:

  • Production of material by Italia
  • Preparation of the two site
  • oClearing where required
  • Establish secure access along the rail track
  • Protection of any services
  • Set up of water withdrawal points
  • Excavation and box out of foundations
  • Placement of Geotextile
  • Placement, compaction and trim of rock fill material in 500mm Layers
  • Quality Control and Management
  • OH&S Management
  • Project Management